Commissioning & Testing

Vacuumed, pressure-tested and calibrated — then proven in cooling and heating.

Close-up of a manifold gauge being read during commissioning

Overview

About this service

Before a system is handed over, we vacuum the pipework, pressure-test it for refrigerant leaks and calibrate its performance, then test both cooling and heating functions. You only hear that it is finished once it has been proven to work.

What’s included

  • Pipework vacuumed
  • Pressure-tested for refrigerant leaks
  • Performance calibrated
  • Cooling and heating functions tested

Ideal for

  • Every system we install
  • Re-commissioning after works

The test sequence

Every step completed before handover.

  1. 01

    Vacuum

    Removes air and moisture from the pipework.

  2. 02

    Pressure test

    Proves the joints hold under pressure.

  3. 03

    Leak check

    Confirms the refrigerant circuit is sealed.

  4. 04

    Calibrate

    Sets the system up to perform as designed.

  5. 05

    Cooling test

    Checks output in cooling mode.

  6. 06

    Heating test

    Checks output in heating mode.

Where this fits

Step 6 of 8 in the lifecycle.